PROJECT DETAILS:

  • This project included the construction of a new solar farm south of Cheyenne, Wyoming, near the Wyoming/Colorado border. 

  • The solar farm was constructed to provide 150 MW AC power and included roadways and a substation.

  • The area covered approximately 729 acres and approximately 10 miles of aggregate surfaced roadway. 

SERVICES PERFORMED:

  • Construction materials testing and observations included field and laboratory testing of soil and concrete. 

  • In addition, drilled pier foundation and reinforcing steel observations were performed at the substation.