PROJECT DETAILS:
- Increased size from 1.2 acres to 3.8 acres
- Upgraded space for craftsmen
- Larger sunken dance arbor (increased from 600 capacity to 1,000 capacity) with shade
- Improved vendor space
- Community building
- Tipi campground and tipi village
- Memorial to American Indian military veterans
- Morning Star American Indian Village
SERVICES PERFORMED:
- Geotechnical engineering for structures at the site: One concern at this site was high ground water from a peanut pond across the street. The site had to be raised 3 feet to stay out of ground water. In addition, high loads for the new Chute No. 9 required a foundation remediation adjacent to an existing retaining wall.
- Construction materials testing – ongoing. Soil and concrete testing and engineering observations were performed during construction.